Free shift calendar

4 on 2 off shift calendar 2028

The 4 on 2 off pattern is a 6 day cycle: four 8 hour shifts, two days off, repeat. A third of the days are free. It is a factory rotation above all, common in semiconductor and automotive plants; in Japan it is searched as 4勤2休 and in Korea as 4조2교대, where three offset crews keep a line running every day.

This page lays out the whole of 2028 for a crew whose first block starts January 1: every shift, every off pair, and the weekends that survive. There is a days grid, stats for the days and nights variants, and a calendar file you can import in one tap.

Suits people who prefer 8 hour shifts to 12s and want a break twice a week. Only two days off per six means the recovery is short.

Quick facts

Cycle length
6 days
Shifts per cycle
4 on, 2 off
Shift length
8 hours
Hours a week
37.4 on average
Crews for 24/7 cover
4.5
Full weekends off in 2028
9
4 on 2 off calendar 2028: twelve months with every worked day marked
Year at a glance. Open the full size image to save it.

4 on 2 off, days, 2028

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
MonWedFriSun
Day shift Night shift Recovery day Off Full weekend off

The grid shows a crew whose cycle starts January 1, 2028; other crews run the same rotation offset by a few days. The 6 day cycle does not divide evenly into weeks, so the rotation drifts through the weekdays. Other crews get a similar year, just shifted. To line the pattern up with your real start date, use the interactive shift pattern visualizer.

The 2028 numbers

Days

Full weekends off

9

Jan 1 crew; all crews: 8.8 on average (8 to 9)

Night shifts

0

244 day shifts

Recovery days

0

no night shifts to sleep off

Longest stretch

4

consecutive shifts

Nights

Full weekends off

0

Jan 1 crew; all crews: 0

Night shifts

244

0 day shifts

Recovery days

61

first day off after nights

Longest stretch

4

consecutive shifts

How many hours is 4 on 2 off in 2028?

Worked in full, 4 on 2 off in 2028 comes to 244 shifts of 8 hours: 1,952 hours, an average of 37.4 hours a week across the whole year. The nights variant works the same dates and the same 1,952 hours; the difference is that every one of them runs overnight. These figures assume every scheduled shift is worked: no overtime, no swaps, no sick days, no leave.

Put 4 on 2 off 2028 in your calendar

One file, every shift of the year, ready for Apple Calendar, Google Calendar, or Outlook. Shifts import with default times: day shifts 7am to 3pm, night shifts 7pm into the next morning (3am). Edit the times after import if your site runs different hours.

A perfect rotation fits in a calendar file. A real roster does not.

Swaps, overtime, and holiday cover break the pattern. Reading a real roster is what the Lumical app does: photograph it and every shift lands in your calendar, overnights included. We make it, so weigh the recommendation accordingly.

Get the app

Common questions

How does the 4 on 2 off schedule work?

Four 8 hour shifts in a row, then two days off. The cycle is 6 days, one short of the week, so each block starts one weekday earlier than the last and the whole pattern realigns with the calendar every 42 days.

How many days off does 4 on 2 off give per year?

A third of the year: 122 days off on paper in 2028. Compare 4 on 4 off or 3 on 3 off, which rest half of all days. The trade is shift length: this pattern usually runs 8 hour shifts, so the average week is 37.4 hours.

How many full weekends off does 4 on 2 off give?

The off pair covers Saturday and Sunday only when it lands exactly on them, which the 42 day drift makes happen about once in six weeks. In 2028 a crew starting January 1 gets 9 full weekends on days, and crews average 8.8. Nights average 0, because a Friday night shift runs into Saturday morning.

How many hours a year is 4 on 2 off?

1,952 hours in 2028: 244 shifts of 8 hours, averaging 37.4 a week. With 12 hour shifts the same cycle averages 56 hours a week, which is why the 12 hour version is rare.

Why does 4 on 2 off feel harder than the numbers suggest?

The breaks are never longer than two days, and on nights the first of the two is a recovery day: the nights variant has 61 of them in 2028, cutting its usable days off to 61. Short blocks of rest, drifting weekdays, and no long block to reset on.

How many days will you work on 4 on 2 off in 2028?

244 shifts, which comes to 1,952 hours at 8 hours each. That leaves 122 days off. The count moves by a shift or two depending on where your crew sits in the cycle on January 1.

How many crews does 4 on 2 off need to cover 24 hours a day?

4.5. The cycle runs 6 days with 4 of them worked, so keeping one position filled every day takes 1.5 crews, and a 8 hours shift needs 3 positions to fill the day. That does not land on a whole number, which is why sites on this rotation cover the gap with overtime or an extra crew.

How do I get this calendar into Apple Calendar?

Download the .ics file on this page and open it on your iPhone or Mac. Apple Calendar offers to add the whole year in one go. That covers the textbook rotation. A real roster has swaps, overtime and cover shifts, and for that we make Lumical: photograph the roster and every shift lands in Apple Calendar. We make it, so read that with the obvious bias in mind.

More shift calendars